Project: CH750-SR   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

Jun 03, 2020     Elevator Trim Tab Channel / Nose Skin Placement - (3 hours)       Category: Tail Feathers
Got trim channel drilled out and placed. Started nose skin placement. Came up with a way to get holes on skin drilled perfectly even though removing the clecos on the spar leads to minor (.5 to 1 mil) misalignments of spar and tip rib. Basically: do not drill all the way through the skin with the slightly misaligned skeleton because the skeleton would have possibly misaligned holes with skin. Drilled part way through skin, removed, drilled rest of way. Worked perfect: Absolute alignment of holes in skin and skeleton when clecoed together. (have vid hopefully on youtube someday ...


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.